A major mishap was averted when hydrogen gas leakage from the turbo generator in the 250 MW ninth unit of the Kothagudem Thermal Power Station (KTPS)’s Stage-V in Palvancha town was detected and plugged in time by the technical staff on Monday.

According to sources, hydrogen gas suddenly leaked from the turbo generator of the unit while being put into operation after an overhaul at about 10.30 a.m. The technical team personnel promptly noticed the leak and fixed it under the supervision of the engineers concerned.

The incident created panic among the staff working nearby the generator for some time. Sources in the KTPS said that power generation will be resumed in the ninth unit soon after a thorough inspection of the leak repairs as per the safety procedures in the next 24 hours.

You have reached your limit for free articles this month.

To get full access, please subscribe.

Already have an account ? Sign in

Show Less Plan

Subscription Benefits Include

Today’s Paper

Find mobile-friendly version of articles from the day’s newspaper in one easy-to-read list.

Faster pages

Move smoothly between articles as our pages load instantly.

Unlimited Access

Enjoy reading as many articles as you wish without any limitations.

Dashboard

A one-stop-shop for seeing the latest updates, and managing your preferences.

Personalised recommendations

A select list of articles that match your interests and tastes.

Briefing

We brief you on the latest and most important developments, three times a day.

*Our Digital Subscription plans do not currently include the e-paper ,crossword, iPhone, iPad mobile applications and print. Our plans enhance your reading experience.



Source link

LEAVE A REPLY

Please enter your comment!
Please enter your name here